I was fortunate to host a visit from the Hampshire County Councillor, Steve Forster today, the man in charge of Highways for the whole of Hampshire.
We were able to discuss a lot of issues relating to highway maintenance and repairs generally and to look specifically at items residents have raised with me in the Eling area.
We were able to visit the High Street and I explained the problem of flooding that follows heavy rain, causing particular issues not just with traffic but the risk of pedestrians (often walking to and from the train station, getting a soaking by passing traffic).
I was able to show him the really poor road surface in Rose road that needs resurfacing.
We discussed the issue of cars parking both sides of Eling Lane but seemed to get to the same conclusion that preventing parking on one side would cause more problems than it solved, particularly because the parked cars do provide a form of traffic calming. I used to get more complaints about card speeding along Eling Lane, less so now it is more challenging to negotiate.
We discussed the issue of the weight limit on Eling toll bridge (2T). He has agreed to check the legal situation regarding enforcement.
Perhaps the biggest problem in Eling is the fact that large lorries sometimes enter the narrow roads of the Eling residential Estate, either getting stuck in the process or causing damage as the try to negotiate out again.
The estate is subject to a clearly marked weight restriction. Unfortunately, some drivers ignore the signage and are following inadequate Sat Nav systems. There did not seem to be a solution to the problem from a Highway engineering perspective. Enforcement is the responsibility of the police. We both agreed that the penalties for driver error or simply ignoring restrictions are not harsh enough.
I raised the issue of repeated temporary repairs to pot holes and the wisdom of undertaking a temporary repair up to five or six times when this could be avoided with a proper sealed repair the first time around. He agreed and said that he would try and change the policy so that a pot hole no longer gets repaired temporarily more than three times. Unfortunately, the highways department are bound by certain restrictions when it comes to doing repairs, especially if it involves a road closure (where they have to give seven days notice).
I was very aware that I could have spent a whole week showing him all of the highway problems that I have across the entire division of Totton South and Marchwood (which stretches from Calmore roundabout almost to Ipley Crossroads in the National Park, but given the time limitations and the fact that he looks after 5000 miles of road, I did my best to provide him with some insight into local issues we have here.
We both agree that Government is not providing the County Council with anything like enough funding to get the highways up to standard. I was told that future funding also depends on how hard a winter we get (which tends to make the roads crack up more quickly).
The funding formula is very unfair because the way National funds are distributed is based on miles of road rather than the stresses on the road caused by weight of traffic and particularly the frequent use of heavy lorries (which have far more impact on road surfaces).